Discover a wealth of knowledge at Westonci.ca, where experts provide answers to your most pressing questions. Get quick and reliable answers to your questions from a dedicated community of professionals on our platform. Connect with a community of professionals ready to provide precise solutions to your questions quickly and accurately.
Sagot :
Volume of tank = (16m)(7m)(7m) = 784 m³
Conversion of m³ to L:
(784 m³) × (1000L / 1m³) = 784,000 L
Rate in the 1st hour:
150 liters/hr
Rate in the 2nd hour:
350 liters/hr
Rate in the 3rd hour:
550 liters/hr
It is apparent that the Fill Rate is increasing by 200 liters/hr every subsequent hour . . . so that can be represented by the following equation
where:
t = number of hours
Fill rate (i.e. volume of water filled into tank within the specified hour) = 150 + 200(t - 1)
For t = 1 . . . Fill rate = 150 L/hr
For t = 2 . . . Fill rate = 350 L/hr
For t = 3 . . . Fill rate = 550 L/hr
Because after every hour there has been more water added to the tank, this problem can be represented as a geometric sequence in order to account for the compounding of the volume after each time step, but it can also be tabulated (which seems to me to be the more direct/simple approach), so I will build a table that accounts for the increasing Fill Rate and the compounding of water volume after each time step . . .
(see attached)
The answer (after all of this) is . . . t = 88 hrs 17 1/2 mins (approx)
Conversion of m³ to L:
(784 m³) × (1000L / 1m³) = 784,000 L
Rate in the 1st hour:
150 liters/hr
Rate in the 2nd hour:
350 liters/hr
Rate in the 3rd hour:
550 liters/hr
It is apparent that the Fill Rate is increasing by 200 liters/hr every subsequent hour . . . so that can be represented by the following equation
where:
t = number of hours
Fill rate (i.e. volume of water filled into tank within the specified hour) = 150 + 200(t - 1)
For t = 1 . . . Fill rate = 150 L/hr
For t = 2 . . . Fill rate = 350 L/hr
For t = 3 . . . Fill rate = 550 L/hr
Because after every hour there has been more water added to the tank, this problem can be represented as a geometric sequence in order to account for the compounding of the volume after each time step, but it can also be tabulated (which seems to me to be the more direct/simple approach), so I will build a table that accounts for the increasing Fill Rate and the compounding of water volume after each time step . . .
(see attached)
The answer (after all of this) is . . . t = 88 hrs 17 1/2 mins (approx)
Putting this as an arithmetic sequence gives:
[tex]u_n = 150+200(n-1)[/tex]
The sum of the series = 16 x 7 x 7 = 784 m^3 = 784 000 L
The sum of an arithmetic series can be written as:
[tex]S_n=n/2 [2a+(n-1)d] = 784 000 \\n/2[2(150)+(n-1)200] = 784 000 \\n[300+200(n-1)=1 568 000 \\300n+200n^2-200n = 1 568 000 \\200n^2+100n- 1 568 000 = 0 \\2n^2 +n- 15680 = 0 \\n= 88.2...,-88.7[/tex]
n has to be positive, so we get
n = 88.2 hours (3 s.f.)
[tex]u_n = 150+200(n-1)[/tex]
The sum of the series = 16 x 7 x 7 = 784 m^3 = 784 000 L
The sum of an arithmetic series can be written as:
[tex]S_n=n/2 [2a+(n-1)d] = 784 000 \\n/2[2(150)+(n-1)200] = 784 000 \\n[300+200(n-1)=1 568 000 \\300n+200n^2-200n = 1 568 000 \\200n^2+100n- 1 568 000 = 0 \\2n^2 +n- 15680 = 0 \\n= 88.2...,-88.7[/tex]
n has to be positive, so we get
n = 88.2 hours (3 s.f.)
We hope you found this helpful. Feel free to come back anytime for more accurate answers and updated information. Thanks for using our platform. We aim to provide accurate and up-to-date answers to all your queries. Come back soon. Discover more at Westonci.ca. Return for the latest expert answers and updates on various topics.