Discover answers to your questions with Westonci.ca, the leading Q&A platform that connects you with knowledgeable experts. Connect with a community of experts ready to provide precise solutions to your questions quickly and accurately. Connect with a community of professionals ready to help you find accurate solutions to your questions quickly and efficiently.

Two chemical plants, one at Macon and one at Jonestown, produce two types of fertilizer, low phosphorus (LP) and high phosphorus (HP). At each plant, the fertilizer is produced in a single production run, so the two types are produced in fixed proportions. The Macon plant produces 1 ton of LP and 3 tons of HP in a single operation, and it charges $600 for what is produced in one operation, whereas one operation of the Jonestown plant produces 1 ton of LP and 1 ton of HP, and it charges $1,000 for what it produces in one operation. If a customer needs at least 100 tons of LP and 180 tons of HP, how many production runs from each plant should be ordered to minimize the cost.

Sagot :

9514 1404 393

Answer:

  100 runs from Macon

Step-by-step explanation:

A graph of the requirements shows the feasible region is bounded by a polygon with vertices (Macon, Jonestown) = (0, 180), (40, 60), and (100, 0).

Checking costs of these solutions, we find the lowest cost to be obtained when ...

  100 production runs should be ordered from Macon

View image sqdancefan