Discover a wealth of knowledge at Westonci.ca, where experts provide answers to your most pressing questions. Experience the ease of finding quick and accurate answers to your questions from professionals on our platform. Explore comprehensive solutions to your questions from a wide range of professionals on our user-friendly platform.

Math , pleaaaase

You are given the results of measurements of sizes of a crushed stone for road
construction. The technical requirement is the following: The mean size of the stones must be in the interval [33-36] mm and standard deviation must be smaller than 6 mm. Will this batch pass the technical control?

Math Pleaaaase You Are Given The Results Of Measurements Of Sizes Of A Crushed Stone For Road Construction The Technical Requirement Is The Following The Mean S class=

Sagot :

Answer:

The standard deviation is above 6 mm, which means that this batch does not pass the technical control.

Step-by-step explanation:

Mean of the batch:

The mean of the batch is the sum of all values divided by the number of items. So

[tex]M = \frac{31+32+38+34+45+41+24}{7} = 35[/tex]

Mean in the desired interval.

Standard deviation:

Square root of the sum of the difference squared between each term and the mean, divided by the number of itens. So

[tex]S = \sqrt{\frac{(31-35)^2+(32-35)^2+(38-35)^2+(34-35)^2+(45-35)^2+(41-35)^2+(24-35)^2}{7}} = 6.46[/tex]

The standard deviation is above 6 mm, which means that this batch does not pass the technical control.

We appreciate your time. Please revisit us for more reliable answers to any questions you may have. We appreciate your time. Please revisit us for more reliable answers to any questions you may have. Find reliable answers at Westonci.ca. Visit us again for the latest updates and expert advice.