Westonci.ca is the Q&A platform that connects you with experts who provide accurate and detailed answers. Our platform offers a seamless experience for finding reliable answers from a network of experienced professionals. Experience the convenience of finding accurate answers to your questions from knowledgeable experts on our platform.

Prepare the description of Kathmandu terai fast track on the basis of the following points
a) objective of the project
b) catchment
c) development partner
d) rationale of constructing the project

please help me with this question!!
I am in need for the answer
︶︿︶(╥_╥)(╥_╥)

anyone who answer this question they will be marked as the brainliest !!!!​


Sagot :

Answer:

Kathmandu-Terai/Madhes Fast Track (Expressway) Project is a mega highway project considered as an “infrastructure of national pride” being constructed in Nepal [1]. The 72.5 km long Fast Track runs along the Bagmati River corridor and is expected to cut the travel distance from the capital Kathmandu to the south of the country by 159 km as per existing roads. The Fast Track originates at Sano Khokana of Lalitpur Metropolitan City (south of Kathmandu) and stretches to Nijghad in Bara district in Nepal’s southern plains (known as Terai/Madhes). There it will meet with the East-West (Mahendra) Highway of the country.