Find the best solutions to your questions at Westonci.ca, the premier Q&A platform with a community of knowledgeable experts. Discover in-depth answers to your questions from a wide network of experts on our user-friendly Q&A platform. Discover in-depth answers to your questions from a wide network of professionals on our user-friendly Q&A platform.

A machine produces 312 bolts in 30 minutes. At the same rate, how many minutes would it take to produce 260 bolts?

Sagot :

Trim
312 bolts in 30 mins
or 312 bots in 1800 seconds

Time for 1 bolt is 1800 / 312 =  5.77secs (rounded to two figures)

260 bolts would take:
260 x 5.77 = 1500secs (rounded)

1500secs = 1500 / 60 mins = 25mins