Discover the answers to your questions at Westonci.ca, where experts share their knowledge and insights with you. Explore comprehensive solutions to your questions from knowledgeable professionals across various fields on our platform. Discover in-depth answers to your questions from a wide network of professionals on our user-friendly Q&A platform.

Please can you show the flow:Identify the main departments and their roles:
Processing Department (PD)
Roasting Department (RD)
Packaging and Sales Department (PSD)
Break down the process into individual steps:
SD: Retrieve and transport 20 units of product to the main PD floor's temporary storage area
PD1: Calibrate the Huller machine and process 1 unit at a time, discarding waste
PD2: Calibrate the Cleaning Machine, clean coffee beans, and check for clogs
RD1: Retrieve a 10 - gram sample from each unit and test for acidity levels and quality
RD2: Preheat the roasting machine and process 1 unit at a time
PSD1: Retrieve 1 unit of roasted beans, add them to the conveyor belt, and package 1Kg bags
PSD2: Seal the 1Kg bags and place them on the sales storage shelves
Create a flowchart using the following symbols:
Oval: Start/End
Rectangle: Process
Diamond: Decision
Arrow: Flow
Design the flowchart:
Start with an oval labeled "Start"
Add a rectangle with the label "SD: Retrieve and transport 20 units of product"
Add a rectangle with the label "PD1: Calibrate Huller Machine and process units"
Add a rectangle with the label "PD2: Calibrate Cleaning Machine and clean beans"
Add a rectangle with the label "RD1: Test and grade coffee beans"
Add a rectangle with the label "RD2: Preheat and roast coffee beans"
Add a rectangle with the label "PSD1: Package roasted beans"
Add a rectangle with the label "PSD2: Seal and store packaged bags"
End with an oval labeled "End"
Connect the symbols with arrows to show the flow of the process.