Westonci.ca connects you with experts who provide insightful answers to your questions. Join us today and start learning! Join our Q&A platform to connect with experts dedicated to providing precise answers to your questions in different areas. Connect with a community of professionals ready to provide precise solutions to your questions quickly and accurately.

The chair of the operations management department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are in control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results? What is the estimate of the mean proportion of failures for these instructors?

INSTRUCTOR NUMBER OF FAILURES
Prof. A 13
Prof. B 0
Prof. C 11
Prof. D 16

Sagot :

Answer:

D. 16

Step-by-step explanation:

A quality analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results:

MACHINE MEASUREMENTS

#1 17 15 15 17

#2 16 25 18 25

#3 23 24 23 22